Projects

/  Oil & Gas

SSGC Gas Pipelines: Rock Trenching by Controlled Blasting

Drilling and controlled blasting for pipeline trenches and right-of-way in rocky terrain

Client

Sui Southern Gas Company (SSGC) and its contractors

Pipelines

Loonikot, 18" Interlink (Khadeji), 8" Ziarat, Kallat

Location

Sindh and Balochistan

Years

2003 – 2004

Image placeholder

Main project photo: SSGC Gas Pipeline Rock Trenching (wide, about 2000 × 900 px)

90 km

Kallat gas pipeline project

18 in

Interlink pipeline, Khadeji

≤ 2 m

Typical trench blasting width

The Project

Overview

Laying gas pipelines through rocky ground needs narrow trenches blasted to depth without damaging the right-of-way, nearby lines or power infrastructure.

Rafique Shah & Co. carried out drilling and controlled blasting for rock trenching and right-of-way preparation on a series of SSGC pipeline projects in Sindh and Balochistan.

Scope of Work

Rock trenching for pipeline laying near village Loonikot, Super Highway, District Thatta (2003)

Rock trenching for the 18" diameter Interlink SSGC pipeline, Khadeji (FJFC, 2003)

Rock trenching and right-of-way preparation for the 8" Ziarat gas supply main pipeline (2004)

Drilling and blasting on the 90 km Kallat gas pipeline project

How We Did It

Our Approach

01

Trench design

Closely spaced, inclined holes and a higher specific charge, as narrow trench blasting requires.

02

Initiation

Electric or non-electric delay initiation; non-electric or protected systems used under high-tension lines.

03

Fly-rock control

Covering material and protection measures for people, property and power lines.

04

Monitoring

Ground vibration and air-blast measured with digital seismographs to protect nearby structures.

On Site

Project Photos

Image placeholder

Trench blasting along the pipeline route (about 1200 × 900 px)

Image placeholder

Pipeline right-of-way through rock (about 1200 × 900 px)

Image placeholder

Kallat pipeline ground-breaking ceremony (about 1200 × 900 px)

Client Reference

Add a short excerpt from the client's letter here once they approve quoting it.

Source: SSGC letter of intent, 15 December 2003

Image placeholder

Scan of the client letter or certificate (portrait, about 900 × 1200 px)

drilling, blasting & rock excavation

Planning Similar Work?

Tell us about your site and scope. We can share the relevant experience certificates and discuss a safe, controlled method.

Mobile 0302-5285284  ·  Office 051-4510430, 051-4511677  ·  rafiqueshah@hotmail.com